Skip to main content

Jacobs to provide technical advice for Welsh Government’s A465 improvements

Jacobs Engineering Group is to provide the Welsh Government with technical advisory services for the upgrade of sections 5 and 6 of the A465 between Dowlais Top and Hirwaun. The A465 is a key transport link in Wales and forms part of the trans-European transport network. It is an important strategic route for the urban area of South Wales, providing routes between key settlements. It connects South and West Wales to the Midlands and beyond, to ports serving Ireland, and to other European destinations.
January 27, 2016 Read time: 2 mins
6320 Jacobs Engineering Group is to provide the Welsh Government with technical advisory services for the upgrade of sections 5 and 6 of the A465 between Dowlais Top and Hirwaun.

The A465 is a key transport link in Wales and forms part of the trans-European transport network. It is an important strategic route for the urban area of South Wales, providing routes between key settlements. It connects South and West Wales to the Midlands and beyond, to ports serving Ireland, and to other European destinations.

As the employer’s lead advisor for this Public Private Partnership, Jacobs is providing outline design services and business case, environmental impact assessment, technical and procurement support, and progression of the project through the statutory process.

The scheme comprises on-line (built over part of the existing road) widening of approximately 16 kilometres of existing three lane carriageway to full dual carriageway standard, with a short off-line section (built away from the existing road) of some 1.5 kilometres at Hirwaun. It includes grade-separated junctions and major structures such as viaduct crossings of the Taff Fawr and Taff Fechan Valleys and Nant Hir reservoir.

For more information on companies in this article

Related Content

  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • EU mobility’s Covid escape route
    July 29, 2021
    European Union roads could be more resilient after the pandemic ends, thanks to the goal of creating a more integrated mobility network, says ERF’s José Diez
  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in