Skip to main content

Jacobs JV wins contract for WestConnex New M5 project in Australia

A joint venture of Jacobs Engineering Group and Aurecon has been awarded a contract to carry out the engineering design for the multi-billion dollar WestConnex New M5 Project in Sydney, Australia. WestConnex is a critical part of the New South Wales (NSW) Government’s integrated transport solution and aims to significantly reduce the congestion impacting hundreds of thousands of NSW road users every day. The New M5, which is expected to double the capacity of the heavily congested M5 East motorway co
May 18, 2016 Read time: 2 mins
A joint venture of 6320 Jacobs Engineering Group and Aurecon has been awarded a contract to carry out the engineering design for the multi-billion dollar WestConnex New M5 Project in Sydney, Australia.

WestConnex is a critical part of the New South Wales (NSW) Government’s integrated transport solution and aims to significantly reduce the congestion impacting hundreds of thousands of NSW road users every day.

The New M5, which is expected to double the capacity of the heavily congested M5 East motorway corridor, providing new twin tunnels 9 kilometres long between Kingsgrove and St Peters, is the largest section of the WestConnex project tendered to date.  It is being delivered by the CPB Contractors Dragados Samsung joint venture, with the Jacobs/Aurecon joint venture providing multi-disciplinary engineering design services.

To assist with the coordination and integration of design with other parties, three dimensional design and building information management (BIM) systems are being used to design and document elements of the project.

For more information on companies in this article

Related Content

  • IBTTA 2011 Annual Meeting highlights developing trends in tolling
    January 26, 2012
    Alain Estiot, chief meeting organiser of this year's IBTTA Annual Meeting and Exhibition, talks about hot topics for discussion. The IBTTA's 79th Annual Meeting and Exhibition, which takes place this year in Berlin in September, will once again take many of the developing trends from around the world and look at their effects on the tolling sector. Host organisation Toll Collect's Alain Estiot, chief meeting organiser, says that the event has to be viewed against a backdrop of major global change.
  • Northwest Transit Systems Partners JV to oversee Sound Transit light rail expansion
    August 23, 2017
    Northwest Transit Systems Partners (NTSP), a joint venture consisting of US transportation design and construction management firm STV, and Mott MacDonald, is to oversee the systems construction of two new light rail extensions for Sound Transit’s light rail system in Seattle, US. The NTSP team will perform systems construction management services for the US$3.7 billion East Link Extension, a 14-mile-long extension connecting Seattle, Mercer Island, Bellevue and Redmond; and the US$1.9 billion 4.3-mile
  • Gulf Traffic 2015 sent to be ‘one of the largest ever’
    October 19, 2015
    Gulf Traffic 2015 is shaping up to be one of the largest ever, say the organisers, with floor space nearly sold out four months away from the opening date. Significant investment over the past year in the Middle East within the traffic management, intelligent transport systems (ITS), road safety, parking, road maintenance and transport infrastructure industries has been reflected in the growth of the exhibition, conferences and awards. The GCC is set to invest approximately US$121.3 billion to improve
  • JMT/Parsons Brinckerhoff JV to consult on Maryland bridge replacement
    July 7, 2015
    The Maryland Transportation Authority (MDTA) has selected a joint venture of Johnson, Mirmiran and Thompson (JMT) and Parsons Brinckerhoff as general engineering consultant for the replacement of the Harry W. Nice Memorial Bridge. The bridge, also known as the Potomac River Bridge, is a 1.7-mile (2.7 km), two-lane continuous truss bridge on US 301 that spans the Potomac River between Newburg in Maryland and Dahlgren in Virginia. The US$1 billion programmed budget involves replacing the existing structure