Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Latest round of TIGER funding announced
    August 1, 2016
    Nearly US$500 million will be made available for transportation projects across the US in the eighth round of the highly successful and competitive Transportation Investment Generating Economic Recovery (TIGER) grant program. Announcing the funding, US Transportation Secretary Anthony Foxx highlight how this will improve safety and economic opportunity in two US territories, 32 states and 40 communities across the country. This year’s TIGER awards include US$19 million to Pittsburgh, Pennsylvania fo
  • Why keeping count is so important for traffic management
    November 21, 2023
    Traffic engineers need to have multiple solutions in their toolbox to complete the most accurate and safe data collection programmes possible, explains Wes Guckert of The Traffic Group
  • FDOT to rebuild major segment of I-4
    September 10, 2014
    US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
  • Collaboration on next generation intelligent travel research
    May 11, 2012
    Cubic Transportation Systems and the Jacobs School of Engineering at the University of California San Diego (UC San Diego) have entered into a collaborative partnership to research the next generation of intelligent travel technologies for cities. Cubic will contribute US$500,000 over five years to the UC San Diego Jacobs School of Engineering to fund research done by faculty, students and Cubic Transportation Systems staff. The project aims to achieve a better understanding of the application and use of em