Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • San Francisco addresses unsafe vehicle speeds
    July 7, 2021
    Quick-build projects are in Tenderloin district where pedestrians are frequently hit
  • US updates ITS strategy for Connected Vehicle deployment
    March 16, 2015
    Jon Masters looks at the USDOT’s new ITS Strategic Plan for the next five years. Emphasis and direction for the next five years of Government led ITS research in the United States has been framed within a new ITS Strategic Plan. The US Department for Transportation’s (USDOT) ITS Joint Program Office (JPO) published the report at the tail end of 2014 after concluding a two-year ITS industry consultation process. The Plan identifies a vision to transform the way society moves and the ITS JPO’s aim of advancin
  • ACS wins Los Angeles tolling contract
    March 2, 2012
    Affiliated Computer Services (ACS), a Xerox Company, has won a contract to deploy a new electronic toll system on two of the busiest highways in Los Angeles County. The new system will allowing toll rates to change based on traffic levels to help reduce highway congestion on the new 'ExpressLanes'.
  • Watch your step: the sidewalk robots are here
    March 14, 2023
    The way we order and pay for goods has changed radically – but what about how those goods are delivered? Gordon Feller looks at how sidewalk robots might reshape the urban landscape