Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

Related Content

  • December 21, 2016
    Ohio River Bridges East End crossing project opened to traffic
    The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
  • December 27, 2023
    Kapsch wins $9m Virginia tunnel deal
    Tolled parallel tunnel is part of Chesapeake Bay Bridge-Tunnel complex
  • June 12, 2013
    High hopes for Detroit streetcar system
    Detroit, the historic home of the US automotive industry, is to get a new streetcar rail system to help drive the economic revival of Motor City. M-1 Rail, the organisation overseeing the US$140 million project, has been pursuing an aggressive timetable toward a late 2015 service launch. “We are now jumping out of the gate,” says Heather Carmona, M-1 Rail’s chief administrative officer. Final design could be completed by mid-August and, depending on when the necessary permits are secured, construction coul
  • August 25, 2015
    North Texas gets closer to high speed rail line
    High speed trains are poised to link Fort Worth to Houston and other metropolitan areas in Texas, following the approval by the Regional Transportation Council (RTC) of US$4.5 million up to 2018 for planning, design, project development and preliminary engineering. The plan calls for US$1.5 million per year to be spent on these activities starting in 2016. Texas Central Partners is working to deliver high speed rail in the Dallas-Fort Worth-to-Houston corridor by 2021, allowing travellers a smooth, conge