Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Tolling is a ‘powerful tool to maintain and manage an infrastructure network’
    August 15, 2017
    Officials have recently moved to scrap tolls on several highways for the first time in 40 years, bucking a national trend toward more tolls on mostly urban roadways to shift the costs of transportation to those who use the roads, writes Associated Press. A regional authority voted this week to eliminate tolls on the Cesar Chavez Border Highway in El Paso. On the same day, Dallas city council rejected plans to build a toll road along the Trinity River. The council's action appears to be the death knell for a
  • Thales to deploy ETCS Level 2 on Turkey's first high-speed rail line
    March 14, 2012
    Thales has signed a new US$26.3 million signalling contract with Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line.
  • Trafficware triumph in Fremont tender
    June 13, 2016
    Trafficware has announced here at ITS America 2016 San Jose that following a competitive bid, the city of Fremont has selected the company’s central traffic management ATMS.now technology and will also add SynchroGreen adaptive signal technology on a 2.2-mile stretch of Fremont Boulevard. The bid team was led by Trafficware’s exclusive distributor for northern California Western Pacific Signal (WPS) and the project will replace an older system. The new technology is scheduled to be deployed by late first
  • Plans for eVTOL service around California's Bay Area
    July 3, 2024
    Archer plans air mobility network to cut journey times in environs of San Francisco