Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Finnish light rail contract awarded
    December 1, 2016
    Finnish organisations Pöyry, YIT and VR Track are to implement the Tampere light rail project on behalf of the City of Tampere for the implementation of the Tampere light rail project. The revised cost estimate for the implementation stage is US$2154.5 million (€238.8 million). The first phase of construction will commence in the first half of 2017 and is expected be complete by 2021. During this phase, the new rail line will be extended by 15 kilometres and a depot will be constructed in Hervanta. The
  • How ITS helped Coachella get its groove back
    November 15, 2024
    California’s Coachella Valley attracts visitors to myriad music and sports events. But now an ambitious traffic management initiative aims to cut travel times and reduce emissions. Adam Hill talks to the engineers involved in the massive CV Sync project
  • ITS America 2016 demos feature V2I technology, truck cruise control, ADAS and more
    June 3, 2016
    ITS America 2016 San Jose, a new show representing this transformative moment in intelligent transportation, is centred on the theme “Integrated Mobility. Transportation Redefined.” Some of the intelligent systems redefining transportation will be on display – running, operating, waiting for close-up inspection and hands-on participation as part of “#THISisITS Exhibits and Demonstrations,” Monday, June 13, through Wednesday, June 15. For full information and registration options, visit www.itsamerica2016.or
  • First phase of Houston reversible HOV to HOT lanes completed
    June 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms