Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

Related Content

  • July 27, 2012
    LB Foster wins $60 million Honolulu rail contract
    Pennsylvania-based LB Foster Company has been awarded the company’s largest rail products contract, valued at approximately US$60 million, by contractor Kiewit/Kobayashi, a joint venture for the county-wide construction of the Honolulu Authority for Rapid Transportation (HART) passenger transit system. LB Foster rail, concrete ties, direct fixation fasteners, third rail with accessories and special trackwork will be installed throughout the Honolulu Rail Transit project’s new elevated railway system and mai
  • January 25, 2012
    Los Angeles Express Lanes links multiple modes of transportation
    The Big Apple's loss is the City of Angels's gain, according to Ken Philmus
  • January 27, 2012
    Rapid growth of bus rapid transit schemes on US Pacific coast
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • February 15, 2013
    TransCore to design and build I-66 active traffic management system
    One of the most congested interstates in Virginia, US, is to get an Active Traffic Management (ATM) system. The Virginia Department of Transportation (VDOT) has selected TransCore, a division of Roper Industries, to design and build its I-66 ATM system on northern Virginia’s main highway into the District of Columbia. The US$34 million contract is 90 percent federally funded and will support thirty-four miles of highway from the District of Columbia to Gainesville US-29 in Prince William County. The projec