Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Milestone for Northern Powerhouse as UK’s first tram train unveiled
    December 14, 2015
    The UK's first ever tram train has been unveiled in South Yorkshire. Vehicles from this government-funded project are designed to run on both the city’s tramlines and the rail network between Sheffield and Rotherham. This will allow passengers to make single journey between tram stops and conventional rail stations from early 2017, once the works are complete. Prior to this, the tram trains will undergo a period of testing, before being introduced on the Supertram network in summer 2016, to provide extra
  • TransCore involved in two ITS New York awards
    April 19, 2012
    TransCore has announced it participated in two winning projects announced at the ITS New York 18th Annual Meeting and Technology Exhibition. Of the six projects to receive awards, TransCore participated in the Outstanding Project of the Year in Traffic Control Systems for Integrated Adaptive Traffic Signal Control Decision Support and the Outstanding Project of the Year in Roadway Management for the New York State Thruway's Woodbury Toll Barrier - Highway Speed E-Z Pass system.
  • Iteris retimes Florida traffic signals
    October 28, 2020
    Programme includes signal coordination and timing improvements at key intersections 
  • US cities opt for variable-rate parking
    May 28, 2014
    Los Angeles and San Francisco are among the US cities opting to use variable-rate parking to make it easier to find a parking space. Los Angeles is piloting LA Express Park, program covering a 4.5 square-mile area of downtown using technology to match on-street parking prices with demand. The objective is to ensure that between 10 and 30 per cent of the parking spaces on each block are open throughout the day. Smart meters and sensors compile occupancy and payment data and based on that information, a pr