Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • WSP/Parsons Brinckerhoff designing new bridge in Florida
    November 15, 2016
    WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
  • DriveWyze wireless Preclear system speeds weighstation waiting
    March 1, 2013
    Drivewyze aims to revolutionise the way weighstation bypass systems work with its Pre-Clear system. And it’s not just looking at weighstations, either… Pete Goldin reports. Truck drivers know the drill: pull off the high­way at every weighstation and wait. Carriers know the drill, too: every minute spent waiting there translates directly into dollars lost. Traditionally, the only alternative to this scenario is a transponder-based system, which allows trucks to bypass the sites using technology similar to
  • Tactile Mobility's virtual virtuous circle
    January 25, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas about what once seemed 'pure sci-fi'...
  • Association news around the globe
    March 15, 2016
    ITS New Mexico’s 2015 award has gone to the state’s Bernalillo County for establishing implementation criteria for adaptive traffic control and the installation of the state’s first system on Alameda Boulevard in Albuquerque. This uses Rhythm Engineering’s InSync Technology.