Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Investment in pedestrian, cycling initiatives pays off
    June 30, 2014
    Five years after the Non-motorised Transportation Pilot Program (NTPP) was established to measure the impact of investment in walking and cycling initiatives, the US Federal Highway Administration (FHWA) has reported a 22.8 per cent increase in walking and a 48.3 per cent increase in cycling, while an estimated 85.1 million vehicle miles were avoided. The NTPP provided approximately US$25 million each to four pilot communities (Columbia, Missouri; Marin County, California; Minneapolis area, Minnesota; an
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • San Francisco cabinet deal for Swarco McCain
    February 17, 2023
    Third contract for ATC cabinets takes partnership with Californian city to 10 years
  • Lyft pulls out of six US cities
    November 25, 2019

    Lyft is withdrawing its scooter operations from the US cities of Nashville, San Antonio, Atlanta, the Phoenix area, Dallas and Columbus.  

    A company spokesperson told TechCrunch “We’re choosing to focus on the markets where we can have the biggest impact. We’re continuing to invest in growing our bike and scooter business but will shift resources away from smaller markets and toward bigger opportunities.”