Skip to main content

Jacobs JV awarded contract for California high speed rail

The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
July 23, 2015 Read time: 2 mins
The 6320 Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design.

The California High Speed Rail is the first true high-speed rail being constructed in the United States, with operating speeds of up to 220 miles per hour. The ultimate program stretches from San Diego to San Francisco and includes connections in major cities along the alignment such as Los Angeles, Burbank, Palmdale, Bakersfield, Fresno and a spur to Sacramento.

The CP 2-3 is expected to provide 65 miles of infrastructure improvements required for the future high-speed rail (HSR), including over 10 million yards of new HSR embankment, 23 HSR structures and 32 new roadway grade separations. The project covers a 65-mile portion of the 120-mile initial construction segment, which will be used as a test track for vehicles before being put into service.

Making the announcement, Jacobs Group vice president Randy Pierce stated, “This project is one of the largest in the state’s history and, once completed, should provide the travelling public with a fast, clean alternative stretching from Southern to Northern California.”

For more information on companies in this article

Related Content

  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…
  • Parsons Brinckerhoff to provide quality control for Cleveland bridge
    February 14, 2014
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • San Diego: Let there be (street)light
    March 30, 2020
    The influence of intelligent streetlights is spreading. David Crawford finds that San Diego’s deployment – and attendant legislation – may offer a blueprint for other cities going forward
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.