Skip to main content

Italian consortium to build Naples-Bari high-speed railway

A consortium of Salini Impregilo and Astaldi has won a contract valued at US$418 million (€397 million) for the design and construction of the Naples to Cancello section of the Naples to Bari high-speed railway line in Italy, part of the Scandinavia to Mediterranean Corridor of the Trans-European Network (TEN).
March 2, 2017 Read time: 1 min

A consortium of Salini Impregilo and Astaldi has won a contract valued at US$418 million (€397 million) for the design and construction of the Naples to Cancello section of the Naples to Bari high-speed railway line in Italy, part of the Scandinavia to Mediterranean Corridor of the Trans-European Network (TEN).

Commissioned by ITALFERR the project is scheduled for completion by 2022 and comprises the first section of the Naples to Bari line, a key part of the upgrading of railway lines throughout the country.

The project also includes the construction of the Acerra station and two urban stations, namely Casalnuovo and Centro Commerciale. The section will extend for about 15.5 km across the Casoria, Casalnuovo, Afragola, Caivano and Acerra areas.

Related Content

  • Thales deploys the first ETCS Level 2 system in Hungary
    March 23, 2012
    Thales and its consortium partner, the Hungarian company Dunántúli Kft., has signed a contract worth over US$91 million with the Hungarian infrastructure company NIF (National Infrastructure Development Company) to provide the state-of-art interlocking and electronic train protection technology for the 66 km Szajol-Püspöklandany line.
  • Consortium to build Denver’s north metro rail line
    November 28, 2013
    A consortium including Graham, Stantec, Parsons Brinckerhoff, Balfour Beatty and Hamon Constructors (GBBH) has been awarded a US$343 million contract by Denver’s Regional Transportation District (RTD) to design and build the north metro rail line. The North Metro project, part of RTD’s sprawling FasTracks transit network, is a proposed 18.4 mile electrified commuter rail line that will connect Denver and Adams County by serving Commerce City, Northglenn and Thornton. Construction begins in 2014 and t
  • Consortium wins US$648 million highway project
    May 27, 2015
    I-77 Mobility Partners, a consortium led by Cintra Infraestructuras, a subsidiary of Ferrovial, has finalised a US$648 million contract with the North Carolina Department of Transportation. The group will design and construct 26 miles of toll lanes on Interstate 77 in North Carolina.
  • Consortium wins Mexico rail project
    November 27, 2014
    A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio