Skip to main content

Israel Railways deploys train planning system

Israel Railways is to use HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing. Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of tr
February 9, 2015 Read time: 2 mins
Israel Railways is to use 5550 HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing.  

Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of track. The HaCon system provides a tailored and integrated planning tool for both yearly timetables and future infrastructure and timetables up to 2020 and beyond that guarantees a seamless interaction with third-party systems and a perfect adaptation to the existing IT infrastructure.

Philip Wobst, project manager and TPS Consultant at HaCon, explains the specific challenges: "In developing the ideal solution for Israel Railways, we integrated rolling stock rostering into the planning process which will be very useful for other TPS customers as well. Also, we added Hebrew language support to our reporting system and had to learn about the effects of winter and summer time on the Shabbat timetable."

Facing a constant rise in traffic demands, Israel Railways director of the long-term planning department Yosef Navon said: "We aim to reach 70 million passengers in 2020, add electrification, and increase the length of track from the current 1,100 kilometres to 1,700 at the same time."

Related Content

  • October 2, 2013
    Cellular coverage on trains to get boost
    According to Ingo Flomer, director of Product Management of UK company Axell Wireless, UK transport secretary Patrick McLoughlin’s intention to upgrade the rail network to enable passengers to access high-speed mobile broadband does not go far enough to promote an integrated communications infrastructure that supports cellular (3G and 4G) coverage on-board trains. Flomer says the UK has significant technological hurdles to overcome to connect rail passengers to the cellular network. The coverage would ha
  • February 1, 2012
    Include ITS in policy decisions from the start, not as an afterthought
    DG TREN's Fotis Karamitsos, on why the European Commission's new ITS Action Plan is looking to the past for future direction. The European Commission's (EC's) new Action Plan for the Deployment of Intelligent Transport Systems in Europe, which was announced as 2008 drew to a close, intends that transport and travel become 'cleaner; more efficient, including energy efficient; and safer and more secure'. At first sight, that wording might be interpreted as marking a significant policy shift within Europe, wit
  • May 2, 2018
    Running on empty
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • June 1, 2016
    B&C Transit modernises Miami-Dade Metrorail’s control systems
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.