Skip to main content

Israel Railways deploys train planning system

Israel Railways is to use HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing. Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of tr
February 9, 2015 Read time: 2 mins
Israel Railways is to use 5550 HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing.  

Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of track. The HaCon system provides a tailored and integrated planning tool for both yearly timetables and future infrastructure and timetables up to 2020 and beyond that guarantees a seamless interaction with third-party systems and a perfect adaptation to the existing IT infrastructure.

Philip Wobst, project manager and TPS Consultant at HaCon, explains the specific challenges: "In developing the ideal solution for Israel Railways, we integrated rolling stock rostering into the planning process which will be very useful for other TPS customers as well. Also, we added Hebrew language support to our reporting system and had to learn about the effects of winter and summer time on the Shabbat timetable."

Facing a constant rise in traffic demands, Israel Railways director of the long-term planning department Yosef Navon said: "We aim to reach 70 million passengers in 2020, add electrification, and increase the length of track from the current 1,100 kilometres to 1,700 at the same time."

For more information on companies in this article

Related Content

  • Siemens to automate railway network in Algiers metropolitan area
    December 23, 2015
    Siemens is to supply the signalling, safety and control systems for the 140 km long-distance rail network in the Algiers metropolitan area. The order will be carried out by Estel RA, a joint venture of state-run Algerian Railways SNTF (Société Nationale des Transports Ferroviaires) and Siemens.
  • Smoothing out city freight movements
    May 28, 2014
    David Crawford welcomes a national first. Urban freight movements, while commercially and socially vital, are a growing logistical headache for planners and people alike. Figures from France’s Lyon Laboratory of Transport Economics indicate that goods transport in major urban areas accounts for: 20% of traffic; 35% of CO2 emissions made by all urban trips; and 50% of the diesel used; while final km delivery runs account for 20% of the total cost of the transport chain.
  • EIB provides loan for Rhine-Ruhr Express project
    July 17, 2015
    The European Investment Bank (EIB) is providing a US$370 million long-term loan to finance the upgrading of the local public transport system in North Rhine-Westphalia, Germany. The funds will be used to purchase 82 new double-deck electric trains offering better energy efficiency, greater capacity and special barrier-free passenger comfort for the Rhine-Ruhr Express (RRX) project. RRX is North Rhine-Westphalia’s most important rail project. Promoted by the four neighbouring transport associations VRR,
  • UK freight trains to be upgraded with European Train Control Systems
    December 20, 2017
    Network Rail has contracted Siemens Rail Automation to install European Train Control System (ETCS) in-cab signalling on 750 of the UK's heaviest locomotives to improve safety and provide better use of the network with plans to retrofit the entire fleet in 2022. This technology forms part of the country's Digital Railway programme, and the government has invested £450m ($602m) as part of its National Productivity Fund. For the first phase, Siemens will install its Trainguard 200 (T200) ETCS on-board