Skip to main content

Israel Railways deploys train planning system

Israel Railways is to use HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing. Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of tr
February 9, 2015 Read time: 2 mins
Israel Railways is to use 5550 HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing.  

Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of track. The HaCon system provides a tailored and integrated planning tool for both yearly timetables and future infrastructure and timetables up to 2020 and beyond that guarantees a seamless interaction with third-party systems and a perfect adaptation to the existing IT infrastructure.

Philip Wobst, project manager and TPS Consultant at HaCon, explains the specific challenges: "In developing the ideal solution for Israel Railways, we integrated rolling stock rostering into the planning process which will be very useful for other TPS customers as well. Also, we added Hebrew language support to our reporting system and had to learn about the effects of winter and summer time on the Shabbat timetable."

Facing a constant rise in traffic demands, Israel Railways director of the long-term planning department Yosef Navon said: "We aim to reach 70 million passengers in 2020, add electrification, and increase the length of track from the current 1,100 kilometres to 1,700 at the same time."

For more information on companies in this article

Related Content

  • Ability to keep in touch on US buses woos travellers
    February 1, 2012
    David Crawford finds evidence of a new trend in American intercity travel: that better access to data sources on the move is tempting passengers away from air travel and onto surface modes. In the US the ease of use of Portable Electronic Devices (PEDs) is successfully wooing long-distance travellers away from airlines and onto surface public transport, according to just-published research. Using data from field observations of 7,028 passengers travelling by bus, air and train in 14 US states and the Distri
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • Tunnel simulators vital for real world tunnel management
    January 23, 2012
    Guillaume Ponsar, tunnel safety engineer with Egis Road Operation, writes about the advantages to be gained from the use of tunnel simulators. Major tunnel disasters over the last decade and more have shown how swiftly and badly a simple crash or fire may evolve should the wrong actions be taken by control room operators or traffic managers. Global safety issues and the reactions of operations staff have now become the principal concerns for Operations and Maintenance (O&M) service providers. As a result, n
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency