Skip to main content

International consortium to deliver Canberra’s light rail network

The first stage of Canberra’s light rail network will be constructed by the Canberra Metro consortium, comprising of Pacific Partnerships, CPB Contractors, John Holland, Mitsubishi Corporation, Aberdeen Infrastructure Investments, Deutsche Bahn International and CAF. Between them they will deliver on 12km of light rail track, 13 stops, 14 light rail vehicles, a depot and 20 years of operation and maintenance. Canberra Metro will construct and operate stage one of Canberra’s light rail from Gungahlin
February 5, 2016 Read time: 2 mins
The first stage of Canberra’s light rail network will be constructed by the Canberra Metro consortium, comprising of Pacific Partnerships, CPB Contractors, 7770 John Holland, 4962 Mitsubishi Corporation, Aberdeen Infrastructure Investments, 5344 Deutsche Bahn International and CAF.

Between them they will deliver on 12km of light rail track, 13 stops, 14 light rail vehicles, a depot and 20 years of operation and maintenance.

Canberra Metro will construct and operate stage one of Canberra’s light rail from Gungahlin to the City.

Light rail will operate from as early as 6am and up to 1am with services every six minutes during peak times. It will integrate with buses and other forms of transport to provide an efficient service that it is hoped will change the way Canberrans move around the city.

“Canberra Metro’s proposal offers an innovative and world-class solution that will deliver better transport for Canberra,” Barr said. “The quality and breadth of the bid responses reflects the stature of this project and the appetite of the international infrastructure community to help redefine our city and further improve its liveability.

“The first stage of Canberra’s light rail network, the corridor from Gungahlin to City, represents a timely investment in a more convenient, efficient, affordable and reliable integrated transport system – a genuine alternative to driving.

“This project is also very important to the ACT economy at a critical point in its recovery; it will deliver jobs for Canberrans during construction and delivers US$862 billion worth of benefits to the city.”

Construction is due to be completed in late 2018 and operations are scheduled to begin in early 2019.

Related Content

  • July 11, 2018
    Cost benefit: Toronto retimings tame traffic trauma
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • September 12, 2014
    Orange County to manage traffic with trial interoperable CCTV
    Interoperable CCTV can provide early warning of problems and help improve traffic management and incident response as Morteza Fahrtash and Carlos Ortiz explain. California’s transportation system is one of the state’s defining features and Caltrans (California Department of Transportation) strives to improving mobility across the state through the design, construction, operation and maintenance of the network of highway, freeways, toll roads and expressways.
  • September 20, 2013
    Lancashire road and rail improvements announced
    Plans for projects to update the road and rail networks in Lancashire have been announced by Transport for Lancashire, a new body comprising Lancashire County Council, Blackburn with Darwen Council and Blackpool Borough Council. The projects will develop, approve and fund major transport infrastructure work with a US$152 million budget from the (DfT) Department for Transport the City Deal for the Preston area, and developer contributions.
  • August 1, 2017
    Strabag consortium awarded HS2 high speed rail civil engineering contract
    The SCS consortium, comprising Strabag, Skanska and Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester. The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.