Skip to main content

International consortium to deliver Canberra’s light rail network

The first stage of Canberra’s light rail network will be constructed by the Canberra Metro consortium, comprising of Pacific Partnerships, CPB Contractors, John Holland, Mitsubishi Corporation, Aberdeen Infrastructure Investments, Deutsche Bahn International and CAF. Between them they will deliver on 12km of light rail track, 13 stops, 14 light rail vehicles, a depot and 20 years of operation and maintenance. Canberra Metro will construct and operate stage one of Canberra’s light rail from Gungahlin
February 5, 2016 Read time: 2 mins
The first stage of Canberra’s light rail network will be constructed by the Canberra Metro consortium, comprising of Pacific Partnerships, CPB Contractors, 7770 John Holland, 4962 Mitsubishi Corporation, Aberdeen Infrastructure Investments, 5344 Deutsche Bahn International and CAF.

Between them they will deliver on 12km of light rail track, 13 stops, 14 light rail vehicles, a depot and 20 years of operation and maintenance.

Canberra Metro will construct and operate stage one of Canberra’s light rail from Gungahlin to the City.

Light rail will operate from as early as 6am and up to 1am with services every six minutes during peak times. It will integrate with buses and other forms of transport to provide an efficient service that it is hoped will change the way Canberrans move around the city.

“Canberra Metro’s proposal offers an innovative and world-class solution that will deliver better transport for Canberra,” Barr said. “The quality and breadth of the bid responses reflects the stature of this project and the appetite of the international infrastructure community to help redefine our city and further improve its liveability.

“The first stage of Canberra’s light rail network, the corridor from Gungahlin to City, represents a timely investment in a more convenient, efficient, affordable and reliable integrated transport system – a genuine alternative to driving.

“This project is also very important to the ACT economy at a critical point in its recovery; it will deliver jobs for Canberrans during construction and delivers US$862 billion worth of benefits to the city.”

Construction is due to be completed in late 2018 and operations are scheduled to begin in early 2019.

For more information on companies in this article

Related Content

  • Auckland reduces airport journey times
    April 16, 2018
    Getting from the centre of Auckland to the city’s airport used to be fraught with unwanted stress for passengers – but a new system combining radar, Bluetooth and Wi-Fi is smoothing things over. Andrew Stone investigates. Struggling to cope with steady growth in passenger numbers and the costly traffic congestion which that can entail, New Zealand’s Auckland International Airport has deployed an innovative system that is smoothing traffic and passenger flows. The same system is also offering new, data-led
  • Louis Berger awarded Mumbai Metro Line four contract
    April 12, 2018
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
  • LA Metro extends Cubic’s service contract
    August 14, 2013
    Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Cubic Transportation Systems a US$54.5 million six-year extension to its system support services contract, covering the repair and maintenance of Metro’s rail fare collection equipment, TAP validators for regional bus operators, and the back office systems. The TAP system supports six rail lines, 80 stations, and over 4,000 buses regionally. Cubic maintains and supports more than 2,000 devices under this service contract. “Our c
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot