Skip to main content

Integrated transport network proposed for Montréal

DPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project. Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week. The solution proposed by CDPQ Infra wi
April 25, 2016 Read time: 2 mins

CDPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project.

Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week.

The solution proposed by CDPQ Infra will constitute Québec’s first public-public partnership project, build a new network of strategic importance for the Greater Montréal area and Québec, while fostering environmentally sustainable transportation.

As a single, integrated transportation network, the REM will offer a number of efficient travel options in the Greater Montréal area. Connections between the new network and existing bus, metro and train systems have also been designed to simplify itineraries.

New stations will be integrated into their urban environment and designed to allow easy access for pedestrians, bicycles, cars and buses. All stations will be covered, climate-controlled, equipped with elevators, and will meet the principles of universal access.
In addition, by choosing the Highway 40 route to the West Island, the project allows for the creation of a dedicated corridor for public transportation, without the need to share tracks with freight trains.

The new network represents an investment of approximately US$4.3 billion. La Caisse is willing to commit US$2.4 billion to the project. The proposed financial structure also requires investments by the governments of Québec and Canada; the decision to move forward with the project is conditional upon this investment.

“Today we are proposing an innovative public transit solution that will improve the quality of life in Montréal and deliver important economic, social and environmental benefits. It will improve the metropolitan region’s overall competitiveness,” said Michael Sabia, president and chief executive officer of la Caisse. “The new transit system will also deliver long-term, stable investment returns very well aligned with the needs of our depositors, the people of Québec.”

Related Content

  • May 1, 2023
    Conduent launches real-time digital payment solutions
    Products could later expand payment options for transit, parking and traffic fines
  • May 1, 2015
    Ontario moving forward with LRT project
    As part of the largest infrastructure investment in Ontario's history, the province is moving ahead with the $1.million Finch West Light Rail Transit (LRT) project, a priority transit investment in the City of Toronto that will bring much-needed rapid transit to communities along Finch Avenue West. The LRT will create 11 kilometres of new rapid transit along Finch West from the new Finch West subway station on the Toronto-York Spadina subway extension to Humber College. Through the Moving Ontario For
  • February 6, 2018
    Canada and Quebec invest in Laval’s public transit service
    The governments of Canada and Quebec will invest a combined $42.6m (£24.3m) for 26 projects by the Société de transport de Laval (STL) under the Public Transit Infrastructure Fund. The plan is part of a strategy to reduce air pollution and create inclusive communities where everyone has access to public services. One scheme involves the replacement of buses to expand and maintain the average age of the fleet, and studies to continue STL’s electrification program. It aims to improve the performance and
  • May 5, 2022
    Nothing basic about universal basic mobility
    The concept of universal basic mobility is here: but Shared-Use Mobility Center CEO Benjamin de la Peña tells Ben Spencer that such schemes may not be looking at the right targets