Skip to main content

Integrated transport network proposed for Montréal

DPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project. Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week. The solution proposed by CDPQ Infra wi
April 25, 2016 Read time: 2 mins

CDPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project.

Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week.

The solution proposed by CDPQ Infra will constitute Québec’s first public-public partnership project, build a new network of strategic importance for the Greater Montréal area and Québec, while fostering environmentally sustainable transportation.

As a single, integrated transportation network, the REM will offer a number of efficient travel options in the Greater Montréal area. Connections between the new network and existing bus, metro and train systems have also been designed to simplify itineraries.

New stations will be integrated into their urban environment and designed to allow easy access for pedestrians, bicycles, cars and buses. All stations will be covered, climate-controlled, equipped with elevators, and will meet the principles of universal access.
In addition, by choosing the Highway 40 route to the West Island, the project allows for the creation of a dedicated corridor for public transportation, without the need to share tracks with freight trains.

The new network represents an investment of approximately US$4.3 billion. La Caisse is willing to commit US$2.4 billion to the project. The proposed financial structure also requires investments by the governments of Québec and Canada; the decision to move forward with the project is conditional upon this investment.

“Today we are proposing an innovative public transit solution that will improve the quality of life in Montréal and deliver important economic, social and environmental benefits. It will improve the metropolitan region’s overall competitiveness,” said Michael Sabia, president and chief executive officer of la Caisse. “The new transit system will also deliver long-term, stable investment returns very well aligned with the needs of our depositors, the people of Québec.”

Related Content

  • Tolling faces up to unprecedented challenge
    October 9, 2020
    The next five years are likely to see a number of changes – but the tolling industry will be equal to them, thinks the IBTTA’s Bill Cramer. The best minds in the business are on the case…
  • Cubic’s NextBus Subsidiary seals real time bus arrival deal
    October 23, 2014
    Cubic Transportation Systems subsidiary NextBus is expanding its market with its first real-time passenger information systems (RTPIS) project outside North America, with TransLink, the public transportation provider in south east Queensland, Australia.
  • How Covid has impacted transportation
    May 2, 2022
    How have Covid-induced changes in transportation impacted health? And how can transport companies mitigate these effects? Soheil Sohrabi of S-Plus-M and Texas A&M University explains
  • PennDOT makes funds available for transportation improvements
    April 8, 2014
    Pennsylvania Department of Transportation (PennDOT) is accepting applications for funding for transportation improvement projects under the Multimodal Transportation Fund created by Act 89. PennDOT can make available US$20 million in fiscal year 2014-15 to distribute to successful applicants. Eligible projects can cost between US$100,000 and US$3 million and they require a 30 per cent match from local sources. PennDOT will evaluate the applications and make selections based on such criteria as safety