Skip to main content

Init wins biggest order in group history

In one of the largest telematics projects for public transport ever deployed in Germany, Init, a provider of ITS and electronic fare management for public transport, will be the general contractor in a project for a joint tendering group led by Rheinbahn Düsseldorf. For this project, Init will set up a Tetra trunked system and install a new intermodal transport control system (ITCS) for the group over the next four years.
July 24, 2012 Read time: 2 mins
RSSIn one of the largest telematics projects for public transport ever deployed in Germany, 511 INIT, a provider of ITS and electronic fare management for public transport, will be the general contractor in a project for a joint tendering group led by 5843 Rheinbahn Düsseldorf. For this project, Init will set up a Tetra trunked system and install a new intermodal transport control system (ITCS) for the group over the next four years.

In addition to Rheinbahn Düsseldorf, three additional transport companies (Duisburger Verkehrsgesellschaft, Essener Verkehrs-AG and Mülheimer Verkehrsgesellschaft mbH) which are represented by VIA Verkehrsgesellschaft, form part of the tendering group. These transport companies carry approximately 1.3 million passengers daily in the Rhine-Ruhr region.

The Karlsruhe based supplier of ITS technology will provide the control centres of the four transport companies as well as over 1,000 buses and trams with the necessary hardware and software (on-board computer, ITCS, dynamic passenger information). When completed the Tetra trunked system will enable some 2,000 radio subscribers to communicate with each other.

The exact contract value will be calculated on the basis of the specification and numbers of vehicles to be equipped and options executed by the client but it expected to exceed US$42 million.

For more information on companies in this article

Related Content

  • C-TRAN Vancouver opts for electronic fare management
    January 26, 2015
    Clark County Public Transportation Benefit Area (C-TRAN) has awarded a contract to Init for the delivery of a state of the art electronic fare collection system in Vancouver, Washington, US. C-TRAN will equip its fleet of more than 100 vehicles with PROXmobil ticket terminals that, when fully operational, will offer passengers both closed loop and open payment fare options. The agreement was made in cooperation with the transit agency of Portland, Tri-County Metropolitan Transportation District of Orego
  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa
  • US eyes European model for Illinois toll road upgrade
    May 30, 2014
    David Crawford welcomes the adoption of European-style ITS technology by the US. The Jane Addams Memorial Tollway in Illinois, US is well on the way towards becoming a ‘smart traffic corridor’, taking full advantage of active traffic management (ATM or ‘managed lanes’) technology that originated in Europe. It is one of the first American toll roads to do so; preliminary work began in 2014 and will continue through to 2016. Jane Addams is one of four toll roads operated by the publicly-owned Illinois State T
  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.