Skip to main content

Indra’s railway control technology to be installed on Spanish rail lines

Indra is to deploy its advanced railway control, security and signalling technology on the high-speed rail lines between Valladolid and Leon and Venta de Baños and Burgos in Spain. The contract, worth more than US$47 million also includes facility maintenance. Indra will deploy the centralised traffic control system on the new line, together with auxiliary detection systems and security sensor concentrators, based on an innovative Indra safety platform. This is the vital processing system that guarantee
July 22, 2014 Read time: 2 mins

509 Indra is to deploy its advanced railway control, security and signalling technology on the high-speed rail lines between Valladolid and Leon and Venta de Baños and Burgos in Spain.  The contract, worth more than US$47 million also includes facility maintenance.

Indra will deploy the centralised traffic control system on the new line, together with auxiliary detection systems and security sensor concentrators, based on an innovative Indra safety platform. This is the vital processing system that guarantees the security of rolling stock and full integration with the various signaling systems.

The lines will also benefit from the latest version of Indra's signal announcement and automatic braking system, ASFA, and the Spanish automatic train protection (ATP) security system. The digital ASFA system has been installed on approximately one third of all trains operating in Spain, but this the first time that Indra has implemented the ASFA system on-track.

Together with Alstom and 513 Bombardier, Indra is part of the Adif consortium which won the contract to install ERTMS level 2 signalling systems on the new lines, together with maintenance for 20 years.

For more information on companies in this article

Related Content

  • New signalling technology for Circle and Hammersmith & City Lines 2018
    October 17, 2017
    Thales has tested a new signalling control system on sub-surface trains on the Circle and Hammersmith & City lines, which enable trains to run closer together. The test aims to provide a more frequent service, reduce waiting times and help boost capacity for the Circle, District, Hammersmith & City and Metropolitan lines. The system will go live on the first section of the network as early as 2018.
  • Thales to supply communications systems for Hyderabad Metro Rail
    December 11, 2012
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w
  • Thales and Kapsch to provide systems for Bulgarian railway
    February 8, 2013
    In a contract worth US$47 million, Thales and Kapsch are to provide Bulgarian railway infrastructure company NRIC with the electronic signalling and telecommunication technology for the Sofia-Plovdiv railway line, part of the International Rail Corridor IV from Dresden to Istanbul. Kapsch CarrierCom will deliver the GSM-R technology for the project, while Thales will deploy electronic interlocking systems for five stations, including outdoor facilities, ETCS (European Train Control System) Level 1 tracksid
  • High speed rail signalling system contract win for Hollysys
    January 9, 2013
    In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected