Skip to main content

Indra to modernise Chilean railway communications

As part of its modernisation of over 550 km of railways, Chilean railroad company, Grupo EFE, has awarded Indra a ten-year, US$7.8 million (€6.9 million) contract for the supply, installation, configuration, testing and maintenance of a multiservice Internet Protocol/Multiprotocol Label Switching (IP/MPLS) communications network. The project, on one of the highest-traffic areas of the Chilean railway, includes the installation of the MPLS network equipment and installation and repair of overhead fibre op
June 7, 2016 Read time: 1 min
As part of its modernisation of over 550 km of railways, Chilean railroad company, Grupo EFE, has awarded 509 Indra a ten-year, US$7.8 million (€6.9 million) contract for the supply, installation, configuration, testing and maintenance of a multiservice Internet Protocol/Multiprotocol Label Switching (IP/MPLS) communications network.

The project, on one of the highest-traffic areas of the Chilean railway, includes the installation of the MPLS network equipment and installation and repair of overhead fibre optics and installation, configuration and testing of the MPLS network's management and monitoring systems. These systems allow for implementing proactive actions in response to situations that may affect the network, reducing the possibility of failures and achieving service availability of close to 100 per cent.

For more information on companies in this article

Related Content

  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Indra picks up €75m dynamic toll system deal in US
    October 31, 2019
    Indra has been awarded a €75 million deal for work to switch a major US roadway to dynamic pricing.
  • Strabag to modernise railway in Czech Republic
    August 28, 2019
    Strabag is to modernise 12km of railway between Oldřichov u Duchcova, part of the village of Jenikov, and the town of Bílina in the Czech Republic. The CZK1.91 billion (£66 million) contract includes the relocation of station platforms, upgrading communications and safety systems along with the associated equipment and establishing barrier-free access to modernised stops and stations. The work is scheduled for completion in the spring of 2021.
  • Kapsch supplies GSM-R solution to Saudi Arabia
    June 24, 2013
    Kapsch CarrierCom is to supply its GSM-R railway communications solution for a prestigious project in the Kingdom of Saudi Arabia, to ensure safe train operations on the 450 km high speed line between the holy cities of Mecca and Medina. The contract, awarded by Indra and the Saudi Railways Organisation, utilises the latest technology based on the European Rail Traffic Management System (ERTMS) level 2. The rail line will connect multiple urban regions as well as the international King Abdullah Airport. The