Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

For more information on companies in this article

Related Content

  • Uber takes to the water in London
    August 3, 2020
    Ride-hailing giant will use River Thames as new route
  • Flagship French motorway inaugurated
    April 16, 2014
    The inauguration of the French Landes A63 motorway marked the culmination of 27 months of major works carried out adjacent to traffic by the economic interest group GIE A63. The road concessionaire, Atlandes, of which Egis is a shareholder, had awarded the construction contract to GIE A63, which then hired Egis for the turnkey integration of fixed and operational equipment and an 80 per cent share of the engineering, procurement and construction management. Atlandes also awarded Egis the subsequent operati
  • Hong Kong's integrated traffic management system
    May 22, 2012
    Hong Kong’s Route 8 now features an extensive and advanced traffic control and surveillance system developed to overcome challenges of great scale and complexity, write Delcan vice president Rex Lee and MD Joseph Lam
  • Using electricity to power road freight
    October 22, 2014
    Next year sees the start of the first real-life electrified road system for transporting freight. Worldwide freight transportation is predicted to double by 2050 but despite expansion of global rail infrastructure only one third of this additional freight transport can be handled by trains. This means that the largest proportion of freight transport will continue to be by road and as a result, experts expect global CO2 emissions from road freight traffic to more than double by 2050.