Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

Related Content

  • March 26, 2012
    $129.5 million Philadelphia fare system contract awarded to ACS
    The Southeastern Pennsylvania Transportation Authority (SEPTA) board has voted to award a contract of up to US$129.5 million to ACS Transport Solutions Group for equipment and services for the installation of a modernised fare system under its new payment technologies (NPT) programme.
  • March 26, 2012
    $129.5 million Philadelphia fare system contract awarded to ACS
    The Southeastern Pennsylvania Transportation Authority (SEPTA) board has voted to award a contract of up to US$129.5 million to ACS Transport Solutions Group for equipment and services for the installation of a modernised fare system under its new payment technologies (NPT) programme.
  • July 22, 2014
    Indra’s railway control technology to be installed on Spanish rail lines
    Indra is to deploy its advanced railway control, security and signalling technology on the high-speed rail lines between Valladolid and Leon and Venta de Baños and Burgos in Spain. The contract, worth more than US$47 million also includes facility maintenance. Indra will deploy the centralised traffic control system on the new line, together with auxiliary detection systems and security sensor concentrators, based on an innovative Indra safety platform. This is the vital processing system that guarantee
  • October 25, 2022
    UITP highlights mass transit changes
    Increasingly, public transport passengers will no longer need to carry a dedicated smartcard ticket to travel, as technology enables virtually any type of contactless payment system to take over the role.