Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

Related Content

  • September 15, 2016
    Indra to deploy contactless ticketing technology in Malaysia
    Mass Rapid Transit Corporation (MRT Corp), Malaysia, has awarded a contract valued at US$37.3 million (€33.2 million) to Indra, in a consortium with local company Rasma Corporation. The company will implement its ticketing technology in the MRT (Mass Rapid Transit) line of Sungai-Buloh-Serdang-Putrajaya, the second subway line in the Klang Valley region, the metropolitan area of Kuala Lumpur (Greater Kuala Lumpur). Indra will handle the engineering, design, development, testing and commissioning of all a
  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • October 23, 2014
    Indra's technology manages the Málaga subway system
    Metro de Málaga in Spain has commissioned Indra to design and implement the control centre that will manage the entire metro infrastructure, including both the rail traffic and the stations. Indra has also implemented the ticketing and access control systems at all the stations on the two subway lines that currently service the city of Málaga.
  • March 24, 2015
    Tenerife opts for contactless ticketing
    Indra has been awarded a US9.9 million contract by Tenerife's regional government to implement the latest public transportation management technology in its urban and inter-city services. Indra will install an operation assistance system (OAS) to manage a fleet of 530 buses on the island and an integrated contactless-ticketing solution for its buses and streetcar services. Indra's new multimode contactless-ticketing system means that the ticket has only to be passed over a reader, replacing the current magn