Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

For more information on companies in this article

Related Content

  • MBTA chooses Cubic to deliver next-generation fare payment system
    November 22, 2017
    Cubic Transportation Systems (CTS) has been selected by the Massachusetts Bay Transportation Authority (MBTA) to install a fare payment system for the region’s multi-modal transit system to allow payment flexibility for customers. The base contract award includes an approximate $575 million (£433 million) for implementation with ten years of operations and maintenance as well two five-year extension options. The agreement also involves a public-private partnership, in which Cubic and John Laing will
  • Hong Kong ticketing
    June 22, 2012
    Hong Kong MTR has awarded Thales a contract to supply an Automatic Fare Collection (AFC) and security access management system for West Island Line (WIL), South Island Line (SIL(E)) and Kwun Tong Line Extension (KTE), which are all new extensions, currently under construction, of the existing MTR rail network. The WIL, consisting of three stations, will add another 3km to the Island Line; SIL(E), with five stations, is a new 7km section; while KTE is a 2.6 km extension of the current Kwun Tong Line with two
  • Alstom consortium wins Spanish rail signalling contract
    April 25, 2014
    An Alstom-led consortium which includes Bombardier and Indra has been awarded a contract worth US$567.5 million by the Spanish infrastructure manager ADIF to supply its European Train Control System (ERTMS) Level 2 signalling system, together with maintenance for a period of 20 years for Spain’s new north-west high speed line.
  • Indra USA to provide ITS transit solution to CAT in Georgia
    July 19, 2012
    Chatham Area Transit (CAT) Authority, in Savannah, Georgia, has selected the US subsidiary of Spanish company Indra to provide computer aided dispatch (CAD) and automatic vehicle location (AVL) to improve transit management both operationally and financially. Indra's technology will allow CAT to instantly determine a vehicle's location, make real-time decisions and to optimise its fleet. Riders of the CAT will be able to obtain real-time data including: next stops, transfers to other lines, incidents and es