Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

Related Content

  • December 10, 2015
    Indra to implement smart technology for Ecuador tram system
    Indra is to provide the engineering, supply and implementation of tram priority and signage systems, along with access control and ticketing for the new tram system in Cuenca, the third-largest city in Ecuador. The system is currently under construction and is expected to begin operating in June 2016. It will be used by around 120,000 passengers a day, or 39 million a year. The aim is to incorporate the transport mode into the Integrated Mobility System, reduce the current levels of traffic and green
  • January 27, 2012
    Indra consortium to provide contactless ticketing technology for KL Monorail
    A consortium led by Indra has won the design, supply, implementation and start-up of the contactless ticketing technology for Kuala Lumpur Monorail in Malaysia for US$6.24 million.
  • January 13, 2015
    Major Middle East ticketing contract for Indra
    Indra is to implement its contactless ticketing systems, access control and cell phone payment solutions for the new public transportation system currently under construction in Riyadh, the capital of Saudi Arabia. The US$314 million contract was awarded by ArRiyadh Development Authority (ADA), the company responsible for modernising Riyadh's infrastructures and also includes maintenance and technological assistance for ten years. Indra will develop an advanced pricing management system for the city's
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.