Skip to main content

Indra to implement ticketing technology for new Algerian trolley line

Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p
September 7, 2015 Read time: 2 mins
8158 Alstom Transport has awarded 509 Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif.

With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi.

Indra will supply ticketing systems for the 27 stations and four interchanges planned for the first section, which is 16.2 kilometres long, as well as the validation equipment for the first 26 trolleys of a total fleet of 39 vehicles.

Indra's technology will be used to process and manage both magnetic tickets and contactless cards simultaneously, speeding up boarding times. As an open system it will also guarantee interoperability, or multimodal management, by incorporating and integrating with the payment systems of other types of transport, and multi-operator management since different companies will be able to use the system.

For more information on companies in this article

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • CTS is preferred bidder to upgrade San Francisco Clipper system
    September 10, 2018
    Cubic Transportation Systems (CTS) has been chosen by the San Francisco Metropolitan Transportation Commission (MTC) as the preferred bidder to modernise the Clipper fare payment system. Currently, 22 regional transit operators use Clipper in the Bay area, including Caltrain, SamTrans and Union City Transit. The upgraded system will include an integrated mobile app supporting a virtual Clipper card and provide users access to real-time information, top up their accounts, plan trips and allow them to tap
  • Alstom to implement new Swedish railway traffic control centre
    October 1, 2015
    Swedish transport administration Trafikverket has awarded Alstom a contract worth US$73.5 million to implement the Iconis railway control centre solution. The new traffic management system will cover the entire country and forms part of a broader project by Trafikverket to improve the punctuality and capacity of its network. The scope of the contract, which will run for eight years with an additional nine-year option, also covers the development and maintenance of the system. Alstom’s Iconis Mainline con
  • Contactless technology paves the way for cross-border interoperability
    November 7, 2012
    Belgian public transport operators De Lijn and TEC, and parking operator Interparking, have selected ASK, French provider of contactless technology, as the supplier of interoperable MoBIB contactless smart cards for transportation in Belgium. MoBIB is a multi-application and multimodal contactless card based on ASK’s TanGO CT 4018 EMV compliant contactless card, with embedded increased cryptography and triple DES security, allowing each operator and service provider to maintain and manage its own customer