Skip to main content

Indra to implement high speed rail traffic management system

State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
September 8, 2014 Read time: 1 min

State Turkish Rail (TCDD) has awarded 509 Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system.

Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks.

In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed rail traffic management for the Ankara-Estambul and Ankara-Konya high-speed lines in the country.

The project includes traffic planning and management for all high-speed lines now under construction, which are scheduled to become operational before 2016, bringing the total of Turkish high-speed track overseen by Indra technology to 2,000.

The Turkish Transport Ministry intends to build a 10,000 km network of high-speed railway by 2023.

For more information on companies in this article

Related Content

  • Indra extends Medellín intermodal public transportation system
    November 19, 2015
    Indra has won a US$2.8 million contract with Metro de Medellín to implement the complete fare collection system for the new Ayacucho trolley and to upgrade the contactless validators for the two subway lines. This new project will integrate the Ayacucho trolley line with the intermodal public transportation system that Indra has implemented in Colombia's second-largest city, and the company’s access control technology will be used in all modes of transport managed by Metro de Medellín. Indra's platform,
  • Indra to upgrade toll road in Ireland
    July 15, 2016
    Celtic Roads Group (Dundalk) has awarded Indra a contract valued at US$4 million (€3.6 million) to renew the toll system on the M1 motorway in Ireland, which connects Dublin to the border of Northern Ireland. Indra upgraded the toll systems on this highway in 2004 and extended the systems to new high-speed roads in 2009. The company is also responsible for the maintenance of the systems. Under the new contract, Indra will upgrade the road infrastructure and the back-office system of the M1 mainline a
  • Grants available to encourage more Londoners to take up cycling
    July 31, 2017
    Transport for London (TfL) is inviting community and not-for-profit groups across London to apply for grants to get their communities cycling. This year TfL is making available up to US$393,000 (£300,000) to help 30 groups offer a range of cycling initiatives aimed at people who may not otherwise ride a bike. Initiatives include cycle training, loan bikes, guided rides and courses to teach basic cycle maintenance. New projects will receive up to US$13,000 (£10,000) over three years. To encourage an even wid
  • Astaldi wins rail upgrade contract in Poland
    June 28, 2017
    The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).