Skip to main content

Indra to implement high speed rail traffic management system

State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
September 8, 2014 Read time: 1 min

State Turkish Rail (TCDD) has awarded 509 Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system.

Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks.

In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed rail traffic management for the Ankara-Estambul and Ankara-Konya high-speed lines in the country.

The project includes traffic planning and management for all high-speed lines now under construction, which are scheduled to become operational before 2016, bringing the total of Turkish high-speed track overseen by Indra technology to 2,000.

The Turkish Transport Ministry intends to build a 10,000 km network of high-speed railway by 2023.

For more information on companies in this article

Related Content

  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
  • Indra’s railway control technology to be installed on Spanish rail lines
    July 22, 2014
    Indra is to deploy its advanced railway control, security and signalling technology on the high-speed rail lines between Valladolid and Leon and Venta de Baños and Burgos in Spain. The contract, worth more than US$47 million also includes facility maintenance. Indra will deploy the centralised traffic control system on the new line, together with auxiliary detection systems and security sensor concentrators, based on an innovative Indra safety platform. This is the vital processing system that guarantee
  • Columbia goes intermodal to support sustainability
    April 10, 2014
    David Crawford on the ups and downs of a Latin metropolis. Medellín, Colombia’s second city and a recognised leader in sustainable transport thinking, is rapidly extending its substantial existing investment in modern mobility. It is deploying both an enhanced integrated traffic management array and the country’s first intermodal public transportation management system. The supplier of both, under separate €9 million (US$12.3 million) contracts, is Spanish engineering company Indra, a major exporter
  • Indra ticketing starts in Riyadh
    December 11, 2024
    New system is part of €266m public transit deal in Saudi Arabian capital