Skip to main content

Indra to implement control centre for Kuala Lumpur LRT and monorail

Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
July 9, 2013 Read time: 2 mins
Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded 509 Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines.

A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the KTM Komuter railway line and other future transport systems for the country.  Supported by a state-of-the-art data centre, the control centre’s advanced management system will provide full integration of all network control and operation elements, integrated management of all lines and greater operating automation.

Indra’s solution will include operational planning, traffic regulation and real-time train circulation monitoring sub-systems.  It will integrate the existing signalling systems and allow remote monitoring and optimisation of the rolling stock and staff schedules. It will also include tools for strategic decision-making and quality service indicators.

For more information on companies in this article

Related Content

  • India to invest in transportation to boost urban economies
    November 13, 2012
    Grand plans have been announced for transport investment in India aimed at boosting city economies. India’s Government Secretary for Urban Development Sudhir Krishna explains all to Jason Barnes. There are many reasons for developed countries’ high levels of urbanisation, not least of which is that the types of employment to be found in towns and cities tend to generate relatively greater wealth and so make greater contributions to a country’s economy. That creates the imperative for developing nations to f
  • Maintaining momentum: learning lessons from the London Olympics
    November 15, 2013
    Japan will not only host this year’s ITS World Congress but has been selected for the 2020 Olympics. So what can Japan, and indeed Brazil, learn from the traffic management for London 2012 - Geoff Hadwick finds out. It was a key moment when Olympic boss Jacques Rogge signed off London 2012, calling the Games “happy and glorious.” Scarred by the logistical disaster of Atlanta 1996 and the last-minute building panic for Athens 2008, Rogge clearly thought London 2012 was an object lesson in how to plan and
  • Thales to upgrade four London Underground lines
    August 4, 2015
    French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag