Skip to main content

Indra to implement control centre for Kuala Lumpur LRT and monorail

Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
July 9, 2013 Read time: 2 mins
Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded 509 Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines.

A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the KTM Komuter railway line and other future transport systems for the country.  Supported by a state-of-the-art data centre, the control centre’s advanced management system will provide full integration of all network control and operation elements, integrated management of all lines and greater operating automation.

Indra’s solution will include operational planning, traffic regulation and real-time train circulation monitoring sub-systems.  It will integrate the existing signalling systems and allow remote monitoring and optimisation of the rolling stock and staff schedules. It will also include tools for strategic decision-making and quality service indicators.

For more information on companies in this article

Related Content

  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • Missouri’s smart solution for rural road monitoring
    July 7, 2017
    David Crawford sees how Missouri is using commercially available information to rapidly improve monitoring and driver information on rural highways. Missouri is a predominantly rural state with the second largest number of farms in the country and agriculture the main occupation in 97 of its 114 counties. US statistics starkly reveal how road accidents in rural areas tend to be more serious than in urban regions and of the 32,000 US motorists killed each year, 54% die on roads in rural areas even though onl
  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar