Skip to main content

Indra to implement control centre for Kuala Lumpur LRT and monorail

Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
July 9, 2013 Read time: 2 mins
Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded 509 Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines.

A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the KTM Komuter railway line and other future transport systems for the country.  Supported by a state-of-the-art data centre, the control centre’s advanced management system will provide full integration of all network control and operation elements, integrated management of all lines and greater operating automation.

Indra’s solution will include operational planning, traffic regulation and real-time train circulation monitoring sub-systems.  It will integrate the existing signalling systems and allow remote monitoring and optimisation of the rolling stock and staff schedules. It will also include tools for strategic decision-making and quality service indicators.

Related Content

  • December 11, 2024
    Indra ticketing starts in Riyadh
    New system is part of €266m public transit deal in Saudi Arabian capital
  • September 8, 2014
    Indra to implement high speed rail traffic management system
    State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
  • March 28, 2017
    Malaysian LRT line orders more Bombardier trains
    Rail technology specialist Bombardier Transportation and its local partner Hartasuma are to deliver an additional 27 Bombardier Innovia Metro 300 trains for the Kelana Jaya Light Rail Transit (LRT) Line in Malaysia. The order from Prasarana Malaysia Berhad is valued at approximately US$388 million (1.7 billion Malaysian ringgit). The lightweight aluminium Innovia Metro 300 trains can move up to 30,000 passengers per hour, per direction. Once final delivery is completed in 2022, these four-car trains will
  • November 30, 2015
    Indra wins in India with two transport and traffic contracts
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with