Skip to main content

Indra to implement control centre for Kuala Lumpur LRT and monorail

Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
July 9, 2013 Read time: 2 mins
Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded 509 Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines.

A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the KTM Komuter railway line and other future transport systems for the country.  Supported by a state-of-the-art data centre, the control centre’s advanced management system will provide full integration of all network control and operation elements, integrated management of all lines and greater operating automation.

Indra’s solution will include operational planning, traffic regulation and real-time train circulation monitoring sub-systems.  It will integrate the existing signalling systems and allow remote monitoring and optimisation of the rolling stock and staff schedules. It will also include tools for strategic decision-making and quality service indicators.

Related Content

  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • February 9, 2017
    PTV sets its sights on Smart City solutions
    Making a city smarter not only relies on understand technological opportunities but also human decision-making, as Miller Crockart explains. Cities are about people – a fact that can easily be forgotten when experts talk about roads, healthcare and education as though they are abstract and unconnected monoliths rather than things people use. Understanding how and why people use services is vital for making decisions on how they can be optimised for maximum efficiency across inter-connected networks that for
  • February 1, 2012
    IP technology the route to efficient multi-agency control rooms
    As IP-based technology makes its presence felt in the control room sector, it makes for greater economies of scale and also offers a migration path for many other traffic management technologies. So says Barco's Guy Van Wijmeersch. Efficient control room collaboration and decision-making is only possible if operators and decision-makers have easy and timely access to information. In many cases, that information also needs to be accessible to multiple users at the same time. This is certainly so in the case
  • October 25, 2024
    Huawei develops the next generation of wireless communications
    Huawei has developed and already deployed high-integrity and richly featured cellular communications solutions for the railway sector which are based on the new FRMCS standard and 4-5G technology