Skip to main content

Indra-Alstom to install tunnel security systems for Spanish high-speed rail link

A consortium of Indra and Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months. Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo
October 22, 2015 Read time: 1 min
A consortium of 509 Indra and 8158 Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months.

Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo transportation throughout the EU. It will link Madrid to Granada in less than three hours.

Indra and Alstom will supply public safety and security systems including emergency signalling and lighting, energy, communications, ventilation, fire detection, water supply and the vestibule pressurisation systems for the emergency exits.

Related Content

  • September 17, 2014
    Indra to modernise London’s Tunnels Control Centre
    Transport for London (TfL) has appointed Indra to modernise the technology for the control and operation of the 12 road tunnels in London and 90 kilometres of approach roads.
  • July 6, 2022
    Thales joins Cairo metro pyramid scheme
    Company will provide communications and ticketing for line connecting Giza with Cairo
  • January 9, 2015
    Chinese company confirms Mexico train tender plans
    China Railway Construction Corp (CRCC) has confirmed its intention to participate in the new tender for the US$3.4 billion Mexico City-Querétaro high-speed rail project. Mexico's transport and communications ministry (SCT) said draft bidding rules for the new tender would be published on 14 January. The project calls for the construction of a 210km high-speed rail link connecting Mexico and Querétaro, via the cities of Cuatitlán and Tula. The high speed train will run for 210 kilometres between Buenav
  • April 19, 2012
    Improving safety at Mersey Tunnel
    Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The