Skip to main content

Impressive performance expected from Ford C-Max Energi hybrid

The 2013 Ford C-Max Energi, a new plug-in hybrid coming to the market towards the end of this year, will reach a top speed of 137 km/h (85 mph) in full electric mode. And with a push of a button on the centre console, the C-Max Energi will go into full electric mode with a range of about 32kms before the engine kicks in to extend the range to 885kms (550 miles). The driver can select an ‘EV later’ mode that saves some plug-in power for later use, such as when the vehicle comes off a highway and transitions
August 9, 2012 Read time: 1 min
The 2013 278 Ford C-Max Energi, a new plug-in hybrid coming to the market towards the end of this year, will reach a top speed of 137 km/h (85 mph) in full electric mode. And with a push of a button on the centre console, the C-Max Energi will go into full electric mode with a range of about 32kms before the engine kicks in to extend the range to 885kms (550 miles). The driver can select an ‘EV later’ mode that saves some plug-in power for later use, such as when the vehicle comes off a highway and transitions to city driving.

For more information on companies in this article

Related Content

  • Hydrogen: transportation's silver bullet?
    June 22, 2021
    As the quest for carbon-neutrality becomes a key political and economic driver, everyone is on the lookout for new sources of energy - so perhaps hydrogen’s time has come
  • M62 managed motorway scheme signs switched on
    February 12, 2013
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis
  • Getting the Max from Traficon
    March 12, 2012
    Traficon has unveiled Viewcom/E Max, its latest innovation for the US market. This module performs all primary functions for communication and transmission of traffic data and alarm events issued by VIP vehicle presence detectors. New for this communication module is its more powerful processor, bringing higher computing performance and the addition of MPEG-4 video streaming functionality.
  • Extended EV charging infrastructure launched
    September 12, 2013
    UK city Corby is aiming to be a leading edge business location, with the launch of an extended electric vehicle (EV) charging infrastructure. To complement the EV charge points already at Corby Station and the Corby Cube, charge points have been installed at a range of venues and businesses including the Holiday Inn, Adrenaline Alley and Corby Town Football Club. Corby now has one of the highest concentrations of charge points per head of population in the UK.