Skip to main content

IBM, Honda, and PG&E enable smarter charging for EVs

IBM has teamed with American Honda Motor Company and Pacific Gas and Electric Company on a new pilot project that will allow communication between electric vehicles (EVs) and the power grid. This project will demonstrate and test an electric vehicle's ability to receive and respond to charge instructions based on the grid condition and the vehicle's battery state. With visibility into charging patterns, energy providers will have the ability to more effectively manage charging during peak hours and create c
April 17, 2012 Read time: 3 mins
62 IBM has teamed with American 1683 Honda Motor Company and 4928 Pacific Gas and Electric Company on a new pilot project that will allow communication between electric vehicles (EVs) and the power grid. This project will demonstrate and test an electric vehicle's ability to receive and respond to charge instructions based on the grid condition and the vehicle's battery state. With visibility into charging patterns, energy providers will have the ability to more effectively manage charging during peak hours and create consumer-friendly programs to encourage electric vehicle adoption.

The energy requirements for electric vehicles will challenge the current power grid as plug-in vehicle counts continue to grow to an expected 2.9 million worldwide by 2017. IBM claims this project has the potential to ease the infrastructure and consumer concerns associated with the mass adoption of EVs, by adding another layer of agility to the EV charging process. This level of intelligence will help make charging seamless for consumers, while ensuring the electricity source is reliable and the infrastructure is stable.

This demonstration combines grid and vehicle data to create an individualised charging plan for Honda's Fit EV battery electric vehicles (BEV), using IBM's cloud based software platform. By using the existing in-vehicle communications system in the Honda Fit EV, the electric vehicle can interact with utilities and the grid, creating a direct channel for sending and receiving usage information that could improve local grid management.

"This pilot project with IBM and Honda will help us demonstrate that third-party providers have the systems and capabilities to help meet some of the challenges that electric vehicles could place on the power grid as their adoption increases in the coming years," said Saul Zambrano, senior director for consumer products for PG&E. "With updated charging patterns for EVs, we have the ability if needed, to shift demand to non-peak times to ensure the reliability of the grid so that we can continue to deliver safe, reliable and affordable energy to our customers."

Once plugged into a charge post, the Honda Fit EV initiates a charge request via the vehicle’s telematics system, which is sent to IBM's Electric Vehicle Enablement Platform where vehicle data such as battery state and grid data received from PG&E, is combined to create an optimised charge schedule, which is then communicated back to the vehicle in seconds. Using this aggregated data, the vehicle has the intelligence to charge to the level that is needed while factoring any current grid constraints.

Using real time and simulated data, the system will test and demonstrate the ability to alter, as well as adapt charging patterns based on grid conditions. This smart charging capability will enable energy providers to manage the power used by EVs during peak times by instructing vehicles to delay or adjust charging if required.

For more information on companies in this article

Related Content

  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • Columbia goes intermodal to support sustainability
    April 10, 2014
    David Crawford on the ups and downs of a Latin metropolis. Medellín, Colombia’s second city and a recognised leader in sustainable transport thinking, is rapidly extending its substantial existing investment in modern mobility. It is deploying both an enhanced integrated traffic management array and the country’s first intermodal public transportation management system. The supplier of both, under separate €9 million (US$12.3 million) contracts, is Spanish engineering company Indra, a major exporter
  • Bigger role for data protection and privacy policies in transportation
    June 11, 2015
    Dr Caitlin Cottrill, lecturer at the University of Aberdeen’s School of Geosciences, examines the impact of privacy legislation on the transportation sector. Growing reliance on big data, underscored by the increasing ubiquity of smart infrastructure and the ‘Internet of Things’, has profoundly impacted the regulatory environment experienced by transportation professionals. This is particularly the case in relation to the privacy of personally identifying information (PII). There has been increased attenti