Skip to main content

Hyperloop One to carry out feasibility study in Dubai

Hyperloop One (H1) is partnering with the Dubai Roads and Transport Authority (RTA) to evaluate the feasibility of building the first commercial hyperloop transportation system from Dubai to Abu Dhabi. The journey is 99 miles (159.4 km) long and normally takes about two hours by car but H1 promises it would take a mere 12 minutes in the hyperloop.
November 11, 2016 Read time: 1 min

8535 Hyperloop One (H1) is partnering with the Dubai Roads and Transport Authority (RTA) to evaluate the feasibility of building the first commercial hyperloop transportation system from Dubai to Abu Dhabi. The journey is 99 miles (159.4 km) long and normally takes about two hours by car but H1 promises it would take a mere 12 minutes in the hyperloop.

H1 revealed an original design concept for the portals and pods that would take passengers from Dubai to Abu Dhabi in H1’s autonomous transportation system.
Hyperloop One will work with McKinsey and architecture and engineering firm BIG to evaluate the concept of a build out for a passenger system in the UAE.

The company announced in October it had received US$50 million in funding from DP World Group of Dubai, the third-largest ports operator in the world, to build a hyperloop system to move cargo throughout the country and the world.

Related Content

  • January 30, 2025
    Abu Dhabi embraces 'diversity of choice'
    The Integrated Transport Centre in Abu Dhabi has big plans. Adam Hill hears why choices in the Middle Eastern emirate's mobility ecosystem are crucial when it comes to economic development
  • September 19, 2024
    The successful road to congestion charging

    City authorities all over the world are finding that, for congestion charging schemes to work in shifting urban commuters out of their cars, there must be reliable alternative modes in place. “Notable schemes including Singapore ERP, London congestion charge, Stockholm congestion tax and HOT lanes in the US have proved that congestion charging is a necessary next step to encourage travellers to use public transport,” says Zeina Nazer, co-founder of Cities Forum (pictured). “Dubai RTA Salik toll was implemented in 2007, with Dubai Metro implemented in 2009.

  • March 25, 2021
    Keolis to operate Dubai metro and trams
    Multimodal contract value set to reach more than €1bn over nine years
  • July 10, 2023
    Teledyne Flir brings Middle East into vision
    As urban sprawl creeps across the Middle East and Africa, congested roads aren’t far behind. Hesham Enan of Teledyne Flir explains to Adam Hill how traffic technology is helping authorities to cope