Skip to main content

Hyperloop One to carry out feasibility study in Dubai

Hyperloop One (H1) is partnering with the Dubai Roads and Transport Authority (RTA) to evaluate the feasibility of building the first commercial hyperloop transportation system from Dubai to Abu Dhabi. The journey is 99 miles (159.4 km) long and normally takes about two hours by car but H1 promises it would take a mere 12 minutes in the hyperloop.
November 11, 2016 Read time: 1 min

8535 Hyperloop One (H1) is partnering with the Dubai Roads and Transport Authority (RTA) to evaluate the feasibility of building the first commercial hyperloop transportation system from Dubai to Abu Dhabi. The journey is 99 miles (159.4 km) long and normally takes about two hours by car but H1 promises it would take a mere 12 minutes in the hyperloop.

H1 revealed an original design concept for the portals and pods that would take passengers from Dubai to Abu Dhabi in H1’s autonomous transportation system.
Hyperloop One will work with McKinsey and architecture and engineering firm BIG to evaluate the concept of a build out for a passenger system in the UAE.

The company announced in October it had received US$50 million in funding from DP World Group of Dubai, the third-largest ports operator in the world, to build a hyperloop system to move cargo throughout the country and the world.

For more information on companies in this article

Related Content

  • Enforcement comes in many guises
    June 22, 2016
    Colin Sowman looks at some enforcement case studies from around the world. It is a sad fact of life that unenforced laws are not adhered to by a sometimes sizable proportion of the public and once enforcement is seen to be lacking, some drivers can take this to extremes and authorities must decide how to regain control.
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Authorities look to MaaS for new solutions and cost savings
    July 18, 2017
    The structure of society and the way in which our cities work will be completely transformed by Mobility as a Service (MaaS), Finland’s minister of transport and communications Anne Berner, told ITS International’s recent MaaS Market conference 2017 in London. In her keynote address, Berner told a packed audience of more than 200 ITS professionals that MaaS has the potential to help governments around the world meet their big city targets such as the rate of employment, the environment, the efficient use of
  • New Mersey crossing ends Halton’s congestion misery
    December 5, 2017
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.