Skip to main content

HS2 ‘crucial to Britain’s future transport needs’

Britain cannot meet its future transport needs without HS2, according to new evidence published by the government. Even with over US$80 billion of planned transport investment over the next six years the country’s railways will be overwhelmed. The strategic case for HS2 sets out in detail the need for a new railway line to provide the vitally needed extra capacity. Central to the case is new data that reveals the true extent of the crisis facing the UK rail network and the impact alternatives to buildin
October 30, 2013 Read time: 3 mins
Britain cannot meet its future transport needs without 1995 HS2, according to new evidence published by the government.  Even with over US$80 billion of planned transport investment over the next six years the country’s railways will be overwhelmed. The strategic case for HS2 sets out in detail the need for a new railway line to provide the vitally needed extra capacity.

Central to the case is new data that reveals the true extent of the crisis facing the UK rail network and the impact alternatives to building HS2 would have.

The document outlines how demand for rail travel will continue to grow. By 2026 on commuter services into London during the evening peak, forty per cent of passengers will be standing. While research by 5021 Network Rail and 1677 Atkins shows that the alternative to HS2 would result in up to fourteen years of weekend closures on existing lines and deliver only a fraction of the additional capacity.

The new railway is also estimated to deliver an annual boost to the economy of up to US$24 billion as a result of productivity benefits to business from faster journeys and reduced crowding. The analysis shows that the railway is vital in rebalancing the economy, benefiting the north overall more than the south.

The government expects considerable regeneration around stations delivering jobs and growth similar to the experience of HS1 (the Channel Tunnel rail link).

Secretary of State for Transport Patrick McLoughlin said: “We need a radical solution and HS2 is it. A patch and mend job will not do – the only option is a new north south railway.  HS2 brings massive benefits to the north, is great for commuters and the alternatives just don’t stack up. Now is the time to be bold and deliver a world class railway which Britain deserves and can truly be proud of. Future generations will not forgive us if we fail to take this opportunity.”

The government has updated the benefit to cost ratio (BCR) of the railway, valuing it at 2.3 or providing two pounds-worth of benefits for every one pound spent. This is similar to Crossrail and higher than the benefit cost ratio for some other major projects when approved, such as Thames Link and the Jubilee Line extension. The BCR will increase to 4.5 if rail demand continues to rise until 2049.

Other benefits of the railway included in the document are estimates from Network Rail that over 100 cities and towns could benefit from new or improved services as a result of capacity released on the existing rail network.

Related Content

  • August 4, 2015
    Thales to upgrade four London Underground lines
    French transportation group Thales has been awarded a £750 million (US$1,160 million) contract by Transport for London (TfL) to upgrade four London Underground (LU) lines. Under the contract, Thales will modernise the signalling and train control system on the Circle, District, Metropolitan and Hammersmith & City lines. Known as the Sub-Surface Lines (SSL), the four lines form a complex network of interlinked routes with numerous junctions which comprise 40 per cent of the LU network and carry up to thre
  • January 3, 2017
    UK commuters spend up to six times as much of their salary on rail fares as other European passengers
    Rail commuters returning to work this week will face fresh fare increases, while spending up to six times as much of their salary on rail fares as European passengers on publicly owned railways, new research by the Action for Rail campaign has revealed. UK workers on average salaries will spend 14 per cent of their income on a monthly season ticket from Luton to London (£387), or 11 per cent from Liverpool to Manchester (£292). By contrast, similar commutes would cost passengers only two per cent of t
  • August 1, 2017
    Strabag consortium awarded HS2 high speed rail civil engineering contract
    The SCS consortium, comprising Strabag, Skanska and Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester. The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.
  • August 18, 2017
    Average driver spends nearly £1,000 and wastes almost five days stuck in traffic a year
    The average UK motorist is being forced to waste £968 and spend 4.9 days stuck in traffic on major roads each year because of congestion, according to new analysis by the Local Government Association (LGA) in its new report, A country in a jam: tackling congestion in our towns and cities. Travel speeds across the country’s local roads continue to decrease, with the average speed on ‘A’ roads now just 25.2 mph, one per cent slower than it was this time last year. Congestion also significantly contributes to