Skip to main content

How connectivity is shaping our rail systems of the future

Rail capability executive for Australia New Zealand, Andrew Collins, will share his knowledge of railway signalling and control systems and highlight their complex interdependency and technical challenges at the Inter-Disciplinary Rail Engineering Workshop in Melbourne this week.
May 27, 2015 Read time: 1 min

Rail capability executive for Australia New Zealand, Andrew Collins, will share his knowledge of railway signalling and control systems and highlight their complex interdependency and technical challenges at the Inter-Disciplinary Rail Engineering Workshop in Melbourne this week.

Collins said the workshop provides an important platform for knowledge-sharing and highlights the need for inter-disciplinary connectivity as we develop future-ready rail systems.

“Attendees will gain an appreciation of how signalling and control system projects interface with other rail infrastructure, with particular focus on advanced train control systems such as European Train Control Systems (ETCS), Communication Based Train Control (CBTC), Positive Train Control (PTC), Automatic Train Operation (ATO) and Automatic Train Scheduling (ATS).

“Communicating advances in the signalling and control function and illustrating how it inter-relates with other infrastructure allows us to get one step closer to a smarter railway system of the future.”

Related Content

  • ITS Australia Summit 2024 celebrates strong Asia-Pacific involvement
    August 2, 2024
    Representatives from 11 ITS Asia Pacific member associations will attend in Sydney
  • Victorian government to implement high capacity signalling on new rail line
    July 18, 2017
    The Victorian government, Australia has awarded CPB Contractors and Bombardier Transportation the contract to deliver the US$790 million (AU$1 billion) Rail Systems Alliance in Melbourne, which includes the roll-out of a 55 kilometre long high capacity signalling (HCS) and communications system. HCS allows trains to safely run closer together, meaning they can run more often. The technology will enable trains every two to three minutes, creating a ‘turn-up-and-go’ train network for Melbourne. The signalling
  • With C-ITS we can get ourselves connected
    June 27, 2025
    Workzones need to be safer for drivers and workers – and the technology exists to harmonise safety with mobility needs, says Swarco’s Daniel Lenczowski
  • Kapsch looks to the future
    December 16, 2014
    Colin Sowman reports from a two-day meeting where industry leaders, academics and political advisers presented their thoughts on the future of mobility. Most governments do not dare to introduce tolling systems… they are too frightened.” So said Georg Kapsch in his capacity of chief operating officer of Kapsch TrafficCom, during a forward-looking press event at the company’s headquarters in Vienna.