Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • Port of Seattle rolls out truck tag program to reduce emissions
    April 15, 2013
    As part of a larger effort to curb emissions from port-related vehicles, the Port of Seattle and its container terminal operating tenants have gone live with a radio frequency identification (RFID) tag program in support of the port’s Clean Truck Initiative. The program roll-out was a success, involving an average of over 2,000 truck gate moves a day with less than two percent of all port registered trucks reporting issues, which were able to be resolved in most cases within fifteen minutes. By gathering t
  • Gridserve EV forecourt coming to Gatwick 
    December 13, 2021
    Each hub can add up to 100 miles of range in less than 10 minutes, firm says 
  • San Francisco plans express lane network across Bay Area
    February 25, 2015
    Colin Sowman looks at plans to convert 240km (150 miles) of HOV/car pool lanes. While some authorities have debated the conversion of high occupancy vehicle lanes (HOV) into express or managed lanes allowing toll paying single-occupant vehicles to avoid congestion, San Francisco’s Bay Area Metropolitan Transportation Commission (MTC) has acted. It is converting 240km (150 miles) of HOV/car pool lanes to express lanes and last fall the MTC’s Bay Area Infrastructure Financing Authority selected TransCore to d
  • APT SkiData equips Gatwick Airport parking development
    March 23, 2012
    APT SkiData has completed the installation of equipment that will manage and control parking for over 1,000 additional vehicles at London’s Gatwick Airport following the construction of a new short stay car park at its North Terminal.