Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • US Cities push for smarter poles
    June 25, 2018
    US Cities The need to connect existing infrastructure has led various US transit authorities into imaginative alleyways: David Crawford examines some new roles for street furniture. US cities are vying with each other in developing schemes to create a new generation of connected places. Their strategies include taking advantage of their streetlight poles’ height and ubiquity to give them new roles in supporting intelligent nodes. They are now being equipped for collecting real-time data on key transport
  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • IRD weigh-in-motion solution predicts structural wear rate on Hong Kong bridge
    April 23, 2013
    International Road Dynamics (IRD) is highlighting a deployment of its weigh-in-motion solution on the Stonecutters Bridge in Hong Kong, showing how the system is able to calculate vehicle weights to predict potential stresses in the roadway.
  • Conduent brings contactless payments to Italy
    August 11, 2021
    Conduent says ticket is not stored on a device or other media, but in the cloud