Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • December 4, 2012
    Public transport operators implement passenger safety systems
    Operators of public transport systems are arming themselves with sophisticated systems of technology to ward off terrorism threats to passenger safety. David Crawford reports. City transportation authorities worldwide are looking more keenly than ever for mass transit solutions to overcome traffic congestion and manage commuter flows. As they do so, concerns over passenger security are driving development of new technologies for terrorist incident detection, response and emergency passenger evacuation. The
  • October 22, 2018
    The long road to Spanish enlightenment
    Julián Núñez, immediate past president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid. Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth: people want to avoid the pain. But pain is something that Spanish operators, including Abertis, OHL, ACS, FCC and Acciona, have been going through for the past decade. The country has
  • December 13, 2024
    Netherlands' first free-flow toll road opens
    A24/Blankenburg connection designed to relieve congestion around Rotterdam
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al