Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • Santiago issues tender for number six metro line
    August 1, 2014
    Chile's Metro de Santiago has called an international tender for the acquisition of lighting systems and their installation in the city's new number 6 line. According to tender documents, rights to participate can be purchased until 29 July. Technical and economic bids are due on 3 October. Technical proposals will be opened the same day, while bids will be unveiled on 24 October. The line is a US$1.06 billion project that will run 15.3 kilometres across the capital from centrally located Providencia
  • Oslo to build biogas plant to supply green fuel for buses
    April 19, 2012
    The city of Oslo in Norway is constructing a new biogas facility which will convert food waste such as coffee grounds and banana peels into green fuel for buses beginning 2013. Local company, Cambi, is constructing the plant, which is to produce the energy equivalent of four million litres of diesel fuel per annum. The plant will use the thermal hydrolysis method. According to the Acting Plant Manager of the Oslo Municipality Waste-to-Energy Agency, Anna-Karin Eriksson, complete capacity for the biogas plan
  • Nissan taxi of tomorrow makes world debut in New York
    April 4, 2012
    The first full vehicle prototype of the Taxi of Tomorrow, the 2014 Nissan NV200, is being featured at the 2012 New York International Auto Show which is open to the public from 6-16 April. After a rigorous, two-year competitive bid selection process, the New York City Taxi and Limousine Commission (TLC) selected the Nissan NV200 Taxi in May 2011 as the exclusive taxi of New York City, beginning in late 2013. The Cooper-Hewitt National Design Museum, the Design Trust for Public Space and Smart Design also ha