Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • Traffic signals turn red to stop speeding drivers
    March 15, 2012
    David Crawford is encouraged by the spread of 'soft' speed policing 
  • Castrol and TomTom to study impact of stop-start driving
    July 22, 2013
    Engine oil manufacturer Castrol has partnered with TomTom to study the impact of stop-start driving patterns across the world. The study will uncover the traffic conditions in fifty key cities and regions around the globe, including New York, Sydney, Beijing, Bangkok, Jakarta, Kuala Lumpur, Moscow, Rio de Janeiro, London, Istanbul and Hong Kong. The report published by Castrol and TomTom in September 2013. Castrol’s studies already show that drivers can experience as many as 18,000 stop-starts every year.
  • Colombia seeks expressions of interest for Bogotá LRT
    December 15, 2014
    Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
  • Compass4D second meeting examines Danish ITS bus project
    April 26, 2013
    Following its successful first meeting in Spain earlier this year, the Compass4D consortium met for the second time in Copenhagen to plan forthcoming work and to participate in a joint workshop with ITS Denmark on ITS deployment best practices. The Copenhagen pilot site is important to the project as the city will deploy cooperative systems on at least ninety buses and at twenty-one traffic signals. The route chosen for the pilot site is a central bus route running between Copenhagen Central Station and the