Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • Truck platooning: the evidence is complex
    February 6, 2020
    A number of claims are made for the value of truck platooning. David Crawford looks at the figures from a new set of examples which suggest that the situation is more complex than you might think
  • Section of M6 motorway to be made ‘smart’
    November 1, 2013
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.
  • Smart screens at Heathrow compare live airport transfer options
    April 21, 2015
    Screens have been installed at London’s Heathrow Terminal 2, showing passengers live price and journey time comparisons between taxis and the airport’s train service to central London. The screens combine real-time traffic, weather and Heathrow Express train service information into one user-friendly data feed, or journey comparison generator, at the terminal’s baggage reclaim zone. This summer the screens at each baggage carousel will be translated to the main language of people on the arriving fligh
  • Marben shows V2X successes at World Congress
    September 8, 2014
    Marben Products is here at the ITS World Congress flushed with major successes achieved this year. The US NHTSA connected vehicle decision and the French government Scoop@F initiative (3,000 vehicles and 2,000 km of roads equipped with V2X) are new significant steps towards the large scale deployment of the Vehicle-to-Vehicle and Vehicle-to-Infrastructure (V2X) communication technology.