Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • How ITS weathers the storm on I-80
    September 7, 2021
    Weather-related closures on Wyoming’s I-80 can cost as much as $11.7m each. But a new initiative is harnessing V2X technology to prevent snow shutting things down
  • Conduent counts on Italian buses
    April 21, 2021
    Passenger-monitoring system will allow transit companies to comply with Covid regs
  • Indra-Alstom to install tunnel security systems for Spanish high-speed rail link
    October 22, 2015
    A consortium of Indra and Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months. Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo
  • The cost benefits of LED traffic signals
    July 16, 2012
    On 11 January 2005, the Kentucky Transportation Cabinet (KYTC) began installing GELcore LED traffic signal modules state-wide through an Energy Savings Performance Contract. In tendering for the work, the energy service contractors could choose any manufacturers equipment but all of them proposed to use the GELcore brand.