Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • Integrated public transport systems ‘make travel easier and more affordable’
    April 9, 2015
    Streamlining schedules, stops, fares, and passenger information among subways, buses and commuter rail, will make it easier for passengers, cut down on operational costs and boost operational revenue, according to a new World Bank paper published today, Public Transport Service Optimisation and System Integration. The paper, which is part of the China Transport Notes Series produced by the World Bank in Beijing to share experiences about the transformation of the Chinese transport sector, claims lack of
  • Free transfers for Moscow surface transport
    September 10, 2021
    Those using transfers are expected to save ₽11,000 a year.
  • Infrastructure projects to drive the construction industry in Norway
    August 7, 2015
    According to a recent report by Timetric’s Construction Intelligence Center (CIC), Norway’s construction industry will continue to expand over the coming five years, with investment in transport infrastructure projects continuing to drive growth. Under the government’s fourth National Transport Plan (NTP) 2014–2023, a series of infrastructure projects will be launched with an investment of around US$86.5 billion. The Norwegian Ministry of Transport and Communications has proposed total investment in th
  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv